This wall showed signs of efflorescence and water infiltration.
Our crew covered the wall to prevent dust from dispersing throughout the building.
The vapor barrier is now installed.
Our crew secured the vapor barrier to the wall.
A work in progress of our crew installing the WaterGuard® perimeter.
After filling the trench with gravel, we covered the WaterGuard® Drainage System with cement.
The wall is now waterproofed.
Our crew cleaned up after the job was done.