
The front cement slab is now stabilized.
The PolyLift compacted the soil beneath the critical points.

A close-up of the cement slab needing support.
This slab had started to sink over time.

The cement slab had sunk by almost 1 inch.
This can often lead to cracking and further deterioration if not corrected promptly.